Two leisure centres – local authority Wiltshire

Simon WrightCase studies, News

Replaced aging gas boilers at two leisure centres with high efficiency wood pellet boiler systems

Turn-key installation under CDM including all building works and landscaping.

Leisure centre decreased energy usage by 50%.

Special features:

  • Leisure Centres had to remain open at all times with no loss of pool temperature
  • New BMS (building management control system) designed and built by BBSM for whole leisure centre
  • Two projects completed in tandem
  • Tight timescales for completion (both completed in a 4-month window)
  • Existing boiler houses to be used – severe space restrictions and operational challenges

Based on performance in 2023 BBSM were awarded the long-term service and maintenance contract for the entire biomass portfolio of the council.